Developer Handover and Defects Liability: What Owners Should Do
The defects liability period is the best time to find and fix construction defects. Here is what owners and management companies should do during it.
When a
developer hands over a new building, the first period of ownership is also the
best chance to hold someone else responsible for defects. During the defects
liability period, the party that built the property is normally obliged to put
right defects that appear. Use that time well.
Know
your period and your rights
Contracts and
applicable laws set the length of the liability and warranty periods, and what
they cover. They differ between projects, so read your sale agreement, the
handover documents and the building's management documents, and take legal
advice if anything is unclear.
Collect
the handover pack
•
As-built drawings.
•
Operation and maintenance manuals.
•
Equipment warranties and test
certificates.
•
Approvals and completion
documents.
•
Asset lists and keys, codes and
access details.
These are the
foundation for future maintenance, and are far harder to obtain later.
Snag
both units and common areas
Owners should
snag their own units, using a checklist such as our trade-by-trade guide. Management companies and
owners associations should inspect common areas, plant rooms, roofs, car parks
and external areas.
Log
defects with evidence
•
Photograph each defect with its
location.
•
Record the date it was reported
and who it was reported to.
•
Keep copies of correspondence.
•
Track responses and deadlines.
Watch
seasonal defects
Some defects
only show in particular conditions, such as roof leaks in rain or AC problems
in peak summer. Check the building through at least one full cycle of seasons
while the liability period is still running.
Inspect
before the period ends
Plan a full
inspection well before the liability period expires, and submit the defect list
in time for it to be addressed. Do not wait until the last week.
Be
careful with repairs by others
Before engaging
another contractor to repair something still under liability or warranty, check
whether this could affect your claim. Agree it in writing where possible.
Plan
the move to ongoing maintenance
Once the
developer's responsibility ends, ongoing maintenance needs a clear owner and an
AMC with a defined scope, as set out in our scope checklist. Good records made during this period carry straight
into it.
Taking over a new building or
unit? Book a
snagging inspection and get a documented defect list while the
liability period still runs.
Spanex Technical Services LLC provides snagging, defect
rectification and AMC services for new buildings across Dubai and Sharjah. This
article is general information and not legal advice.