Office Fit-Out in Dubai: From Space Plan to Handover, Stage by Stage
An office fit-out programme is won or lost before construction starts. Here is how the process runs from space plan to handover, and where delays usually begin
Companies tend
to judge a fit-out by how long construction takes. In practice, the programme
is decided earlier, in design decisions, approvals and the lead time of
materials that were ordered too late.
Stage
1: Space planning and design brief
Headcount,
meeting room needs, storage, pantry and server room requirements are fixed
first. Changing the layout after approvals have been submitted is one of the
most common causes of delay and extra cost.
Stage
2: Landlord and authority approvals
Building
management reviews the design against its fit-out guidelines, which usually
cover working hours, contractor requirements, finishes and connections to
building services. Fire and life safety requirements typically need approval
from the relevant authority as well. These steps can often run in parallel when
the drawings are complete and consistent.
Stage
3: MEP coordination
Air
conditioning distribution, lighting, power, data cabling and security all share
the same ceiling void and walls. Coordinating them on one drawing before
construction avoids clashes on site. When electrical, HVAC and ELV are
delivered by one contractor, that coordination happens inside one team.
Stage
4: Construction
Partitions and
ceilings go up first, followed by first fix services, then flooring, joinery,
painting and second fix. The sequence protects the finish. Painting before
floor protection is down, or fitting joinery before ceilings are signed off,
creates damage and rework.
Stage
5: Testing, snagging and handover
Systems are
tested, the snag list is closed, the space is deep cleaned and documentation is
handed over, including warranties and as-built drawings where required.
Where
delays usually come from
•
Design changes after approvals
have been submitted.
•
Long lead items such as glass
partitions, specialist flooring or custom joinery ordered late.
•
MEP clashes discovered on site
instead of on drawings.
•
Missing landlord approvals for
out-of-hours work or material deliveries.
Planning an office move or refit? Book a free
consultation and we will map the stages for your specific space.
More on our fit-out services.